Weld RE-8 – Early Childhood Education Center & Admin Building

Owner:

Weld-8 School District

General Contractor:

Haselden Construction

Engineer:

Envision Mechanical Eng

Architects:

Hord Coplan Macht

Project Duration:

6/1/2017 – 1/08/2018

New 21,000 square foot two-story early childhood education (ECE) on the first floor, with district administrative office on the second floor. Building constructed on a shallow foundation system with a slab on grade. Vertical structure is steel frame construction and the exterior envelope is comprised of cold formed metal framing and continuous exterior insulation. RTU’s, VAV’s, Boilers and Kitchen Exhaust.